Robotic arms that assemble panels on solar farms

(fastcompany.com)

156 points | by justicz 13 days ago

24 comments

  • nojvek 13 days ago
    If we want to grow US economy by making existing humans more productive per capita, then we need cheaper energy per capita, cheaper intelligent robots per capita. Also goes to say we need less NIMBY-ism per capita.

    We need high speed rail building robots, solar farm building robots, home building robots, healthcare robots. Cheap repairable open robots. Robots that defend us, robots that transport.

    More robots than humans. More robot companies diverse in their approaches.

    • sgu999 12 days ago
      What will humans do in that setup? I always fail to understand how replacing labor by capital in our current system helps for prosperity once a certain threshold of productivity is reached.

      Sure selling your physical labor isn't ideal, but it's better than having no wage at all because there's nothing in your reach that isn't done by robots. We won't have a basic income, Americans can't even get a proper healthcare...

      • countvonbalzac 12 days ago
        I guess theoretically humans do more complex work? Rather than screwing in a solar panel, humans supervise the robots that screw in the solar panels. Then in theory we'll have the same number of humans employed in the solar industry but 10x the solar installed per year. When spreadsheets came along we didn't have less accounting work, we had infinitely more. That being said I am very skeptical that AI will be the same, or that our society is in any way prepared for a rapid transition away from human labor.
        • nojvek 11 days ago
          Humans working on farms with tractors are more productive than humans working with oxen to till land.

          Accountants working with computers are more productive than accountants working with books and a hand-held calculator.

          There will be a Pareto curve of distribution.

          If we want to reduce the cost of things, we have to reduce the cost of inputs and make the markets transparent (while holding a base level of quality and safety).

          This is why TVs and electronics become cheap while healthcare costs balloon out.

      • financetechbro 12 days ago
        Everyone will become skilled technicians
    • vasco 12 days ago
      I'm 100% up for less NIMBYing but I'm not sure it'd work in my neighborhood.
      • yurishimo 12 days ago
        This mindset it exactly nimbyism. You live there so it’s your responsibility to fight for your desires as well!
    • grecy 12 days ago
      > Robots that defend us

      Defend from who, and who is us ?

      • XorNot 12 days ago
        How can you seriously be this naive?

        There's a country in Europe currently being invaded in a war of conquest because the invader can for the explicit purpose of subjugating the population and seizing territory and natural resources.

        • abswest 12 days ago
          Lets put a face to a name - Russia, somehow yet not officially recognized as a terrorist state.
          • CommanderData 11 days ago
            There's another that's killed 71 children every day for the last 6 months.

            We support that Terror state too, Israel.

      • Ekaros 12 days ago
        Maybe from attacking others? So each time someone calls for a war or some such action they would be shot automatically by AI controlled robot with gun. Seems effective and reasonable solution.
    • protomolecule 12 days ago
      You don't need 'capita' in this world.
    • rangestransform 12 days ago
      The construction unions (at least in nyc) are more likely to throw rocks at the robots
    • steve76 12 days ago
      [dead]
    • bugbuddy 13 days ago
      Please reconsider the part “robots that defend us.” There have been many books and movies made about this idea. I don’t think we want it.
  • zer00eyz 13 days ago
    I always go back to GM and its first welding robots. They had to make changes to the construction and engineering process to optimize for those welders (and for them it was slow).

    I assume that the current install process is fairly "human optimal". How much of that changes with your product to make it "automation" optimal? Were there small changes here for big wins? Or are you still using the same process with complex automation (the GM way), and do you see challenges arising from that?

    • justicz 13 days ago
      One of the coolest parts of our job is figuring out what tweaks we can make to the process to make things more robot-friendly!

      One thing we're already doing that's different from human installers is the bay pre-assembly approach you can see in our demo video, where we build chunks of 5-9 modules on a tube and carry them out to the field. Ordinarily humans put up all of the tubes, then all of the brackets, then all of the modules. The pre-assembly approach allows us to do a bunch of work in a more controlled factory environment on a different part of the site.

      Longer term there are other ideas we have, but since everything has to last for 30-40 years out in the field you have to be very strategic about making the big changes...

      • mkoubaa 13 days ago
        There was User Experience (UX) and then Developer Experience (DX). Now there could be Robot Experience (RX). I wonder which of the same principles would apply.
        • choonway 13 days ago
          RX is called design for manufacturing. Nothing new.
    • fbdab103 13 days ago
      I think of this as Rosie Jetson robotic development. In the Jetsons cartoon show, you can watch the robotic maid, Rosie, manually washing dishes like a human. Today, we have a dedicated device purpose built for dish cleaning that operates nothing like a human. What is the end state of a machine which can operate more efficiently without being built around the human pattern?

      (Although, Wikipedia is telling me dishwashers already existed at the time of the Jetsons, so my analogy is bad, and I should feel badly).

      • kjhcvkek77 13 days ago
        If I want to wash 100 dishes I'll take a dishwasher. But if I want a single dish washed followed by watering a single plant followed by taking out the trash I'll take Rosie.

        Humanoid robot has much more Jack of all trades potential.

    • Smoosh 13 days ago
      So often I see the word robot used, when machine would be more appropriate.
      • pinkmuffinere 13 days ago
        What’s the difference between a machine and a robot? I’ve commonly heard “it’s a robot until it works, then it’s a machine”
        • adrian_b 12 days ago
          There is no generally-agreed definition, but I would use the word "robot" only for machines that have manipulators (i.e. some equivalent of arms with hands; something similar to octopus tentacles or elephant trunks also qualifies as a manipulator).

          Originally "robot" was used only for humanoids, but the only essential capability that distinguishes robots from earlier machines are the manipulators, so in all other respects they may not resemble humans or animals nowadays.

        • pgorczak 12 days ago
          Maybe “an automated thing that moves to do stuff”. Generally there are manipulators and mobile robots like vacuums. An interesting edge case would be a CNC machine which has degrees of freedom similar to a pick and place robot but is seen as a whole static thing with moving parts. Also if the mobile platform transports people it’s usually not called robot.
  • ericd 13 days ago
    This looks pretty awesome, but any reason you don’t use these in a central location to make foldable preassembled racks, instead of transporting the factory to the site?

    Seems like you could fold them like an accordion into whatever max size can be carried by a forklift, drop them in place, pull them out to unfold, screw the whole prewired assembly down with ground screws, and plug it into the neighboring assembly?

    This would probably work best with E/W racking, would go from tightly packed to corrugated.

    I’m sure there are challenges I’m not considering, but with modules getting insanely cheap, it seems like racking/assembly/inverters are starting to dominate, and scaling up from single modules to full assemblies assembled in factories seems like a good next step.

    (I’ve been building my own 20kw ground mount array, so I’ve had plenty of time to daydream about something we could’ve just dropped and pulled out)

    • justicz 13 days ago
      Hey thanks! The trouble with the origami racking approach is that the engineering decisions you make to build a portable, foldable racking system go in some different directions from what makes the best hardware for long-term, large-scale installations.

      A couple of ways this shows up: 1. making your system rugged to handle extreme weather. These sites need to last 30-40 years without breaking, which pushes you to use pretty heavy + large components. Piles get driven several feet into the ground, so even with unfolding systems you're still probably pile driving. 2. tracking -- adding the complexity to enable rows to rotate to face the sun makes it harder to make the system portable. Basically all large-scale solar getting built is single-axis tracked. 3. module cleaning -- it's important that vehicles can traverse rows to clean dirt off of modules on a regular basis. Having structure that connects the rows together may make this more difficult.

      None of these are intractable on their own but together they make the approach you describe very difficult.

      • ericd 13 days ago
        Thanks for going through that! We used aerocompact, with 18” ground screws/anchors (a lot of them), and their engineering plans for our anticipated wind load didn’t even require all possible ground screw spots to be filled, so it seems like piles might not be strictly necessary?

        With panels getting so much cheaper, is tracking necessary still? Maybe if land is at a premium, but I know the aerocompact commercial deployments don’t support tracking.

        • justicz 13 days ago
          Fascinating! My initial thought is that this is going to be very soil dependent. Is this the system you were using? Was it ballasted? https://www.aerocompact.com/en-us/products/ground-mount
          • ericd 13 days ago
            Yeah, we used the g20 south-facing ground mount, no ballast, about 40 18” ground screws for a 48 panel array (relatively small 108 cell panels). Soil is clay, for reference, not very rocky, so might be unusually well suited for the screws. Easy to drive with a socket wrench or impact wrench, 1” heads.
      • mxfh 13 days ago
        30+ years sounds excessive for managed installations (anything thats not just sitting inaccessibly on a roof with prohibitively expensive access costs), would think max 10-20 years, if you have the option to upgrade some higher efficiency panels for maintaining best ROI given current trends continue and land being a cost factor in most regions.
    • glumreaper 12 days ago
      Your description almost exactly matches the Maverick solar array produced by the Aussie company 5b (https://5b.co/) - you are definitely on to something.

      Factory assembly and field deployment is a far faster, safer, and higher quality method of building solar farms.

      • ericd 12 days ago
        Ha awesome, that looks almost exactly like what I was imagining. I guess it was somewhat obvious to anyone who’s used racking like the one I used and thought about it. I wonder how well their system works in practice, but I can’t imagine it’s less efficient than positioning/attaching these things and wiring them up in the field, and then crawling under and tucking tons of wires away with painful little clips.

        Now that that’s taken care of, we just need some way to get the interconnection queues moving faster :-)

  • bsder 13 days ago
    > In some cases, solar construction companies were turning down projects because they couldn’t find workers. In other cases, workers were commuting for hours to get to sites with no hotels or grocery stores nearby.

    So ... tired ... of ... this.

    This is NOT a shortage. This is lack of salary. The oil industry somehow manages just fine to get workers to really out of the way places.

    Apparently the companies aren't drowning in enough projects to pay more money.

    Why is that?

  • philipkglass 13 days ago
    Modules for solar farms have been getting larger and heavier, but the maximum size/weight has traditionally been limited by what human workers can heft into place. I'm interested in what the optimum size ends up being when those human limits are removed.

    What's the most labor intensive part that remains when robots are putting the modules into place on racks? Attaching cables? I would guess that robots still aren't dexterous enough for that.

    • jjk166 13 days ago
      I doubt the size limit would be removed. Even if the system is installed by robots, it's presumably going to be maintained by humans. If a panel dies early or gets damaged, you want to be able to swap it out. There are also economy of scale benefits for maintaining a common architecture with other solar applications, like rooftop installations.
      • theendisney 13 days ago
        The pannels really are roofs. We are building roofs without homes under them.
        • IshKebab 12 days ago
          Not really. They aren't water tight. You can get solar roof tiles but they're more expensive than traditional panels.
          • namibj 12 days ago
            Rail systems could and if you look for it, already do form gutters along the panel-to-panel seams to not drip water inside the contiguous array area.

            Still cheaper than a metal roof intermediate layer, though. But in places like Germany overhead glass outside of some limited applications (notably greenhouses for farming) isn't allowed to drop on anyone's head just from a sharp pebble impacting and cracking a glass layer. Sadly the regulations are just as strict for a home carport/garage-without-door as for a majestic train station hall. So aside from the worse cooling it's in practice cheaper to just use a corrugated sheet metal layer to catch rain and falling glass, with the structural support for both unified.

    • justicz 13 days ago
      For us, we're happy for modules to get quite a bit bigger since the time it takes to build a bay (what we call one assembly of a few modules on a metal tube) is approximately proportional to the number of modules, so bigger modules => fewer modules => faster build times. Our robot arms could handle much larger modules.

      For traditional human installation, we're already approaching the limit of reasonable module sizes -- today's modules take two people to lift and align.

      • hgomersall 12 days ago
        Can you not prefab larger modules from smaller modules off-site?
    • quickthrowman 13 days ago
      > Modules for solar farms have been getting larger and heavier, but the maximum size/weight has traditionally been limited by what human workers can heft into place.

      Are there installers that actually use humans to lift solar panels onto racking on solar field projects? I figured everyone was using vacuum pump panel lifters instead of humans these days as it’s much faster and less prone to injury.

      One example: https://unimove.com/lift/solar-panels/

      These can easily be fabbed up by a single person, it’s just some steel and a couple vacuum pumps.

      • ghshephard 12 days ago
        I'm trying to find recent Time Lapse videos - here is one from Australia, 2020 - at the time the largest in Western Australia - so at scale. All the panels were hand lifted by one person. https://www.youtube.com/watch?v=uCtFG-hIHdM

        Ahh - better - here is one at scale from a year ago. https://www.youtube.com/watch?v=72UlzbsON4M

        West Texas:

          - 200 MW
          - 1200 Acres
          - Piles -- 68,350
          - Support Piles  (Crew does 80-100 piles/day)
          - Tracker System
          - 490,150 Solar Modules
          - 540 watts/module
          - Crew can install 500 panels a day
          - These are multi person 2-4 people lifting.
          - 500 workers on site - doing 6200 panels/day.
          - (That suggests ~40 person crews if all worker installing 
          panels.   Wow - now I see why this is a big deal)
          - Cables panels -> Inverters
          - Big Inverter install to to convert to AC
          - Lots of concrete pouring for substation/Inverter Pad.
    • Teever 13 days ago
      I would imagine that the next constraint in the size would come from the supply chain, so you'd probably end up seeing panels that are 4'x8' if human liftable weight wasn't a consideration.

      Perhaps the next size up would be the interior dimensions of a cargo container so they could slide in/out like sticks of gum.

    • theendisney 13 days ago
      The limit is often what you can put on a road.
      • mkoubaa 13 days ago
        Eventually a blimp
  • Zopieux 13 days ago
    Every time I see news of a robotics company reportedly disrupting an industry, all I can see is the very large amount of prep work using conventional techniques (read: humans in excavators) to prepare the terrain for the (usually very strict) constraints of the robot being publicized.

    If the new robot can install panels very quickly, but you need 3 weeks to flatten the field to unreasonable tolerances or install tons of dedicated framing and supports for it to function, your efficiency gains or cost saving numbers will take a hit.

    Those considerations are unsexy and boring, they put a shade to the press release, yet are very important to assess the value of the innovation. I'll trust a company when they start being transparent about these aspects.

    • iancmceachern 12 days ago
      Another example:

      These folks built a robotic restaurant. It took the form of a food truck in a shipping container, and they put it in our little food truck area here. I then saw for the next 3 months, engineers frantically running around a semi operational thing, until they took it away because it didn't work.

      The investors could have just invested in some food trucks, and made money.

      • Zopieux 12 days ago
        Yeah. The most ridiculous example I think are the "3d printed" mud houses. Just look at the amount of support infrastructure. What a joke.
    • lardo 11 days ago
      There already exists tight constraints on field grade. The mounting hardware has limits to how much one section can differ from the next. You can imagine that you need each horizontal beam some maximum number of degrees from parallel, and the vertical posts will only have so much extra length to account for variation.
  • dang 13 days ago
    Related:

    Launch HN: Charge Robotics (YC S21) - Robots that build solar farms - https://news.ycombinator.com/item?id=30780455 - March 2022 (81 comments)

  • m463 13 days ago
    "It’s possible to install as much as 1 megawatt of solar power in a day, and a project could use multiple systems at once."

    pretty cool.

  • terramars 13 days ago
    i'm down with solar robots, but this is definitely one of those problems that's only a problem because of overly restrictive immigration laws. installing panels is pretty easy, there are tons of people who would be delighted to come to the US and install for $20/hr.

    source : have a solar engineering firm in Kenya, and have never had problems with panel installation labor (QA is another story).

    • dumpHero2 13 days ago
      How did this become about immigration? A lot of americans would also do it for $20 an hour.
      • onlypassingthru 13 days ago
        Have you ever seen a non-hispanic landscaper in the desert southwest metropolitan areas? Me neither.

        Now try to find ANYBODY willing to work out in the middle of the Mojave or Sonoran deserts. Espero que hables bien español.

        • beaeglebeachh 13 days ago
          Hispanic!= Immigrants. Much of the southwest was formerly even part of Mexico, many of those people didn't even move in the history of the US.
          • onlypassingthru 12 days ago
            Try talking to a landscaper anywhere in the desert southwest and see for yourself. Not the guy who has his name on the truck because there are a few natives who still own the business because inglesa, talk to the guys actually doing the work out in the sun. 100% Hispanic immigrants.
    • __MatrixMan__ 13 days ago
      I haven't used their product, but in a former life I had these guys as a customer: https://raptormaps.com/

      It seemed like a pretty solid idea re: the QA part.

  • stuaxo 13 days ago
    Great, this definitely needed.

    On the domestic side we need go make rooftop solar more efficient to install for countries like the UK, there aren't enough people to do it there either.

  • mrlongroots 13 days ago
    This is really cool!

    Broadly, I think there's so much potential for computing in construction. If we can model logistics decisions as optimization decisions, we can leverage incredibly efficient solvers to extract efficiencies. The challenge, of course, being the "info pipeline" - integrating machines with construction processes and planning software and orchestrating it all in a way that adds value.

    If an entire construction plan is modeled, you could also compile it into a staged procurement/shipment plan, and essentially orchestrate the supply chain in sync with the jobsite activities.

    It'd be cool to have more info on how the process looks like with/without these machines, how rates of specific activities are impacted etc. but a bunch of this stuff is probably proprietary.

    • akira2501 13 days ago
      The challenge is that nothing gets built strictly according to the plan. Solar farms seem easy because there's no foundation, everything is above ground, and there's essentially no finishing involved.

      This really is the "lowest hanging fruit" of the construction industry.

      • Arrath 13 days ago
        There are foundational elements, those arrays of panels do have to be mounted to the earth somehow after all. I've built solar farms where we drilled thousands of 5-foot deep, 6-inch diameter holes with 1/4" tolerance for the location. Into which pipes were concreted and the long crossbars for the panel arrays were installed.

        Did the tolerances truly need to be so tight? Probably not, and just set so by a designer somewhere. But the panels do have to line up for tying into conduit that goes to (pad mounted) transformers and distribution equipment, etc.

        • akira2501 12 days ago
          Sure, but in that case, the alignment really just saves you on conductors, it's not required for the larger structure to operate correctly. The posts aren't meaningfully tied together in any structural way unlike a post and pier "foundation."

          What I meant was, for something like a building, the plan will describe the invariants of the design, but what it really reveals are all the available variants in achieving that outcome on the actual site. With a solar farm that available variance is actually very small because the overall "plant" has very little additional or emergent structure.

          • mrlongroots 8 days ago
            Delayed follow-up:

            This is somewhat like AVX - it only works if you have large enough vectors (a simple operation that is repeated a million times on contiguous data). Arbitrary buildings are much harder to optimize.

  • cesarb 13 days ago
    For comparison, here's a nice video (in Brazilian Portuguese, but should be understandable even if you don't know the language) showing a solar farm being built in the traditional way: https://www.youtube.com/watch?v=_W1nQT7az8c
  • foota 12 days ago
    Would it ever make sense to pour foundations of some kind rather than put in poles? I'm thinking maybe a trench making machine could be used and concrete poured into the trench, and then the solar panels could be secured by putting a wide base into the concrete instead of a pole?
  • exabrial 12 days ago
    My good buddy, Union carpenter, laughs at Silicon Valley hipsters trying to replace his industry with robots.

    One of his greatest quotes is ‘We already have 3d printers for buildings, they’re called cranes’.

    His advice every time I send him one these articles usually rounds to: ‘If these smart@$$ %|~>heads would spend a couple of weeks on the job actually sweating and doing some real labor, they’d realize the problem isn’t lifting things, it’s organizing it.’

    • XorNot 12 days ago
      I mean he can laugh but then one day it'll have happened.

      For one thing, he's already identified but failed to realise the problem: organising labour to be on site and ready to work is expensive and tricky.

      But when there's less labour and more machines, you're now only paying opportunity cost, not direct costs of people turning up and being unable to complete the job because it's not ready to go yet.

      And unlike people, the quantity of capable machinery can constantly increase and thus the cost per unit decrease.

      Eventually the machine is cheap enough to leave on site even if something else delays it.

  • michael1999 13 days ago
    What's the turn on capital for a buyer? Like, how many panels does a construction company need to install to pay for your system, and how does that line up to project size?
    • lostlogin 13 days ago
      I would like to know this, but it would get complicated fast.

      The robot presumably doesn’t need many breaks and can go all night. But any outage can’t have someone else sub in.

  • sburl 13 days ago
    This seems like a great construction robotics application since you have such an empty / controllable site. Did you ever consider teleoperations as well?
  • IshKebab 13 days ago
    Seems like it assembles individual panels into bigger blocks... But why do that on site? Surely you can do that much much easier in a factory somewhere?
    • marcosdumay 13 days ago
      Well, then you'll have to solve how to transport those larger blocks into site.
      • abdullahkhalids 13 days ago
        The sizing of so many large objects is determined by what fits efficiently into a standard shipping container or truck.
  • sp332 12 days ago
    In the last photo in the article, why are the panels at such a steep angle and pointing away from the sun?
    • justicz 12 days ago
      ...we may have turned the rows for a photo-op :)
  • singularity2001 12 days ago
    What's the name of the solar company that just lays down solar panels flat on the ground? Ersolar? That's the future of solar Farms. panels are just cheap enough to cover the ground flatly without complicated buildings.
  • sandworm101 12 days ago
    This thing mounts panels and screws them in. So? That is maybe 1% of the needed labor, and could be more easily optimized through better connectors (snap-on or drop-in panels). Show me the robot that can survey and install foundation posts, wire up the panels, or clear brush and open the pallets of equipment during initial setup. The robot revolution is coming, but this isn't it.
  • falcor84 13 days ago
    Why did you disable the comments on your YouTube teaser?
  • imtringued 12 days ago
    Do this on the moon and you're going to have a multi billion dollar company.